And then we built on. It was the collaboration around the very sexy topic of wastewater, which to try to make a very complicated story short, South Bend was a billion dollar mandate from the EPA to change the way that the sewer system emptied into the river. It was basically impossible to comply unless they figured out a different way to better use the sewer system that we had. (43:58–44:05)
CLAIM
Asserts that South Bend faced a billion-dollar EPA mandate regarding its sewer system.
This is an excerpt from a raw transcript. The assertions have not been audited or verified. Tap the video to view the source footage and understand the context.