But it passed with a pretty wide margin. I want to talk to the folks out in Acton. There's this Bess, and I've talked about this a few times, … Bess facilities are these big battery energy storage systems... they put it right on the San Andreas fault. … lines. They put it right next to the 14, right next to a railroad and about three miles away from the dam that holds all the water for the Anaheim Valley. (04:19–04:38)
CLAIM
Claims that a battery energy storage facility is located on the San Andreas fault.
This is an excerpt from a raw transcript. The assertions have not been audited or verified. Tap the video to view the source footage and understand the context.