I don't think you need PhD for stuff, but you do need competent personnel. So I don't know. I mean right now, like Tesla's pedals to the metal max production of going as fast as possible to get AI5 Tesla AI5 chip design into production and then reaching scale. That'll probably happen around the second quarter ish of next year, hopefully. And then AI6 would hopefully follow less than a year later. But. And we've secured all the chip fab production that we can. Yes. You're currently limited on TSMC fab capacity. (28:51–29:10)
CLAIM
Asserts that Tesla aims to scale AI5 chip production by the second quarter of next year.
This is an excerpt from a raw transcript. The assertions have not been audited or verified. Tap the video to view the source footage and understand the context.