And so we're looking at ways to say, how can we make it so that it doesn't have to be renourished nearly as often. A year ago, we put in half a million dollars to have a project, design and engineering done for something like Tigroids. Those are rocks that would go out from the shoreline in different increments down the beach and make it so that the sand doesn't have the ability to just wash away. (01:09–01:17)
CLAIM
Asserts that $500,000 was allocated for the design and engineering of Tigroids a year ago.
This is an excerpt from a raw transcript. The assertions have not been audited or verified. Tap the video to view the source footage and understand the context.