Is that an issue, a challenge that you have to. You and the other commissioners have to deal with? Yes, definitely. So, again, without getting ahead of ourselves, We are seeing a huge uptick for a number of factors in not only filings, but especially filings of the commission that require a lot of technical analysis and review related to generation construction and transmission construction. And that's not just limited to a specific group within the PSE or staff. It touches almost everything that we do, whether it's environmental review, accounting, project management, obviously engineering and technical review. (13:04–13:20)
CLAIM
Asserts there is a huge uptick in filings requiring technical analysis related to generation and transmission construction.
This is an excerpt from a raw transcript. The assertions have not been audited or verified. Tap the video to view the source footage and understand the context.