Well, we didn't just talk about it or make it a political talking point. We actually studied all of the roads in the county, the county highways, that is. And I asked our engineers for an inventory of every type of road and every type of maintenance on that road from now until 2050. And then tell me, with an inflationary index, what is it going to cost to fix all of those roads for the next, at that point, 33 years. (09:12–09:20)
CLAIM
Asserts that an inventory was requested for road types and maintenance needs in Washington County through 2050.
This is an excerpt from a raw transcript. The assertions have not been audited or verified. Tap the video to view the source footage and understand the context.