He said it would take me about a year and a half to build out the interchange. Okay. Seems right. He could have done the engineering in eight months. Florida Department of Transportation says [engineering for an interchange] takes three years. years. So three years for engineering. A year and a Half to two years for construction. So I'm gonna get an interchange off the turnpike in five years, an interchange I needed last year. (14:23–14:28)
CLAIM
Asserts that the Florida Department of Transportation requires three years for engineering an interchange.
This is an excerpt from a raw transcript. The assertions have not been audited or verified. Tap the video to view the source footage and understand the context.